Where DAIT fits

One sealed node design, deployed where power and demand already exist

DAIT places industrial-grade AI compute on sites that already have spare electrical capacity and usable space. The cabinet, the mesh OS and the commercial model stay the same across every sector — what changes is the host, the load profile and the approval path.

2–4 weeksSecondary grid-drop install
~20–60 kWPer node, by tier
ZeroHost capital expenditure
Why site type matters

The hardware does not change. The deployment case does.

Every DAIT node attaches to an existing secondary grid drop, which is what allows deployment to skip substation interconnection, rezoning and multi-year municipal approval cycles. What differs between a hospital roof and a stadium pad is structural access, load profile, security posture and the data-governance regime the host operates under.

01 · Electrical

Existing capacity, not new capacity

Nodes are sized to spare capacity behind the meter. On-site storage absorbs peak demand, which is where commercial electricity bills concentrate.

02 · Physical

Sealed for outdoor placement

An IP65-rated cabinet removes the need for conditioned indoor space. Roof, pad and wall placements all use the same enclosure and thermal design.

03 · Governance

Compute inside the jurisdiction

Workloads execute in the region they serve, on a zero-trust mesh with mTLS identity, AES-256-GCM links and hardware-enforced memory encryption.

Tier reference

Three footprints of the same node

Tiers differ by cabinet count, not by architecture. Mid and High Tier figures are the Base Tier model scaled by cabinet count.

TierTypical deployment siteCabinetsCapacity / nodeGPUsOutput tokens / sec
Base TierResidential walls & urban micro-edge sites1×~20 kW163,520
Mid TierCommercial rooftops, hotels & medical campuses2×~40 kW327,040
High TierStadiums, factories, ports & logistics hubs3×~60 kW4810,560

Reference workload: Llama 3.3 70B Instruct, FP8 planning profile. Throughput figures are theoretical capacity at 100% utilization. DAIT is at pre-pilot stage — no node has yet been deployed in the field, and achieved GPU-hour rates and utilization remain unvalidated.

Site qualification

Five checks clear a site

The same qualification gate applies to every sector. Sites that clear all five move to survey and licensing.

  • PowerSpare electrical capacity behind the existing service.
  • SpaceRoof, pad or wall able to carry the cabinet.
  • ConnectivityOn-site network connection, or a straightforward extension.
  • ClearanceCrane or vehicle access for placement and servicing.
  • LegalAuthority to grant multi-year licensing rights over the location.

Master site agreements: a single agreement with a multi-property owner can secure dozens of locations in one negotiation, which is how portfolio operators in commercial, residential and public estates are typically engaged.

Assess a site against the deployment model

Tell us the sector, the available space and the service capacity. We will come back on tier fit, indicative economics and the qualification gaps that matter.

Start a site assessment